Z 3 ,Z-?-/? STATE OF MARYLAND 

MARVIN MANDEL, GOVERNOR 



SUPPLEMENT SHOWING 



PRELIMINARY PLANS 

AND OUTLINE SPECIFICATIONS FOR 
MAJOR BUILDING PROJECTS IN THE 

1971 Fiscal Year 
Capital Budget 




Maryland Dept. of State Planning 



This Supplement to the 1971 Fiscal Year Capital Budget contains 
the preliminary plans and outline specifications for major con- 
struction projects included therein. The preliminary plans for 
the following projects were not completed at the time this 
Supplement was printed: 



New Boiler Flant - Annapolis 

Workshop for the Blind - Salisbury 

New Armory - Whiteoak Area 

Regional Mental Retardation Center - Salisbury 

Second phase construction - Maryland Metropolitan 
Washington Retardation Center 



The purpose of the Supplement is to assist in visualizing the 
projects and their functions. It should be studied with the 
Capital Budget Report. This document is designed to meet the 
requirement of Chapter 121 of the Acts of 1956 which calls for 
submittal of preliminary plans and outline specifications for 
permanent construction projects at the time the construction 
funds are requested. 



The estimated building costs given in this Supplement include 
all fees involved. 



TABLE OF CONTENTS 

PAGE 

FORWARD 



DEPARTMENT OF CORRECTIONAL SERVICES 

Maryland House of Correction 

Gymnasium Building 

PATUXENT INSTITUTION 

Maintenance and Service Building 

MARYLAND SCHOOL FOR THE DEAF 

Gymnasium Building 

STATE COLLEGES 

Bowie State College 

Auditorium-Classroom Building 10 

Morgan State College 

Education Building 

Towson State College 

Classroom Building No . 2 

UNIVERSITY OF MARYLAND 

Maryland State College 

Auditorium Building 

Addition to Dining Hall 

Baltimore County Campus 

Addition to Library 

Swimming Pool Addition 



DEPARTMENT OF CORRECTIONAL SERVICES 

GYMNASIUM BUILDING 

Maryland House of Correction 
Jessup 

PROJECT DESCRIPTION 

The institution does not have a gymnasium. This project will 
provide a 96' x 270' building containing approximately 26,000 
square feet. The building will be reinforced concrete and cement 
block construction, tied into the existing wings of the institution. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown to the right. Outline specifications are: 

Exterior walls Reinforced concrete at the floor 

level with masonry brick above. 

Structure Steel, reinforced concrete and 

concrete block. 

Roof Composition built-up, 20 year type 

surface on steel decking. 

Interior Interior finish concrete or 

painted slag block. Wainscot of 
coating type used in gymnasium. 

Floors Reinforced concrete with asphalt 

tile finish. Toilet rooms of 
ceramic tile; gymnasium floors 
of maple. 

Electric Standard fixtures . 

Heating Unit heaters suspended from the 

ceiling. 

Plumbing Standard fixtures. 

Air conditioning None 



ESTIMATED PROJECT COST 

Construction $1+95;, 000 



o 




< 

M 
M 



FL 



it' 



_ j ■_. 
S 




■M3AO minviisn 



o 



■e- 



o 



ft r 



rtrr 



3nnE_ 



rr 



O 

o 







^%-r- 



... 



T^-U 



J 




=3 ts 



a 

C3 
1=3 




^ Q_ 




► 



CO 



>- 



PATUXENT INSTITUTION 

MAINTENANCE AND SERVICE BUILDING 
Jessup 

PROJECT DESCRIPTION 

The Institution does not possess a Maintenance and Service building. 
This project will construct a 30' x 90' building containing approxi- 
mately 2,700 square feet. The building will house the shops and 
equipment needed to enable the Institution to accomplish the necessary 
repairs to its property. The structure will be compatible in appearance 
to the existing buildings . 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at right. Outline specifications are: 

Exterior walls Brick and concrete block 

compatible with existing 
buildings . 

Structure Bearing walls; open web joists. 

Roof Flat; built-up 20 year type 

surface . 

Interior Unfinished exposed concrete 

block. 

Floors Reinforced concrete on grade. 

Electric Standard required for hazardous 

use in garage and paint areas. 

Plumbing Standard fixtures . 

Air conditioning None 

Miscellaneous Installed system for automobile 

exhaust . 



ESTIMATED PROJECT COST 

Construction $ 98,500 

Site improvements 1,500 

Total $100,000 



y'-B" i ji-g" I 7-^* 



s 



;== 



id 



L.d 



w- 



h JiSl 



i 



Maint6.nance._ Shop 



Electrical Shop 



Plum Bing Shop 



Pa i m t Shop 



Garage 



$>■ 



p_: 



=!-• -I- 



E3- 



: 



^7~ 



^F 



TE.-2 
ro -o" 



FLQOfl Plan 








mtG n ' 




', 


. 


•■ 


. 




1 


\ 

V 

•* 












* 














,' 



North Elevation 



West Elevation 



A 



a 




5outh Ele\ 



East Elevation 





! . "' .»„» 


n - v . 


' '- 


- 


Hr:.;r"" * 






u 




MAIMTENANCE^CttviCC SuiLDlNg, 
Patuxsmx UftTiTuTiow- Jump, Md. 



LOCAT/OA/ PLJAJ 



MARYLAND SCHOOL FOR THE DEAF 

GYMNASIUM BUILDING 

Maryland School for the Deaf 
Frederick 

PROJECT DESCRIPTION 

This facility, containing a swimming pool encompasses approximately 
Ii3,000 gross square feet. The building will also provide the basket- 
ball courts, exercise rooms and classrooms required for the projected 
enrollment of 500 plus students. The present gymnasium is completely 
inadequate and this facility will enable the school to develop and 
maintain the necessary physical education programs. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans as shown at right. Outline specifications are: 

Exterior walls Brick exterior cavity type with 

block backup. 

Structure Steel and reinforced concrete. 

Roof Concrete plank insulated with 

20 year type built-up roofing. 

Interior Slag block painted partitions 

and walls except in toilet and 
showerrooms which are ceramic 
tile or special coated wain- 
scots; ceiling in Gym exposed 
structure; acoustical tile 
generally in other rooms . 

Floors Maple in Gym, otherwise vinyl 

asbestos tile; ceramic tile in 
toilet and shower rooms. 

Electric Standard as required for Gymnasium. 

Heating Standard for type of building. 

Plumbing Standard for type of building; 

filtration system for pool. 

Miscellaneous Foldaway bleacher seating in 

gymnasium. 



ESTIMATED PROJECT COST 

Construction $1,197,500 

Site improvements 25,000 

Total $1,222,500 




F I K t T 



F L L 



P L A 



p e. o p o ; t d 



CYMNiilUM 



B. U I L D I N t 



1 I Y L 4 N P 



E. C U L 



r o n 



T II [ 



P E 4 f. 



STATE COLLEGES 

AUDITORIUM-CLASSROOM BUILDING 
Bowie State College 
Bowie 

PROJECT DESCRIPTION 

This facility which contains approximately 130,000 gross square feet, 
includes an auditorium seating 1000 persons and instructional areas 
for art, speech, drama, music, English and modern languages. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at the right. Outline specifications are: 

Exterior walls Brick, glass and pre-cast concrete. 

Structure Reinforced concrete. 

Roof Flat, built-up composition roof. 

Interior Brick and painted slag block; generally 

exposed construction; special acoustical 
consideration and treatment in audi- 
torium and music practice rooms. 

Floors Vinyl asbestos, concrete and tile. 

Electric Conventional for type of building; basic 

stage and auditorium lighting. 

Heating Central Plant steam conversion. 

Air conditioning Conventional for type of building provided 

throughout . 

Miscellaneous Standard type theater seating in Auditorium. 



ESTIMATED PROJECT COST 

Construction $5,0£0,1|00 

Site improvements and utilities 229 ? 600 

Total $5,280,000 



10 



rn 




Ll 


u. 




Uf 


ii. 








(/> 


(ft 






















to 


o 


o 


O 


in 


IO 










o 








CD 


o 


f- 


w 


CM 


<M 






lO 


IO 


r. 




n 














rC 


f£ 














o 














n 








rr 






J 








o 
n 






' 


0. 






u. 












rr 




h 














































VI 




"■ 


u. 




< 

rr 




a 


z 


Q 


n 


<o 


ui 




a 


2 

2 


D 

9 


o 
Li 


o 


I 


< 




o 


e> 


« 


££ 


o 





< 
a. 




*Oi3 



11 




--fcriL 



-r 
— a= 



n- 


=-«"-----*= 




^ 






. 


•- 


9 






1 


j 


g 


;E- 


h 




t % 


S -J 




is s: 


S "- 


.'s 




I a 


K ; 


£ T" 


= - 


?s s« 


; : si 


L 



K 
O 
O 



O 



J ■ J- 




ir 
o 
o 



? 


3 5 


1 


5a 




i/ 




* , 






/ 








= 


a 




■ t 


! 


i 1 


T ' 




- 


•T 


r 


» 


f 




£3 

1 1„ -.- -=- 


f j 



LUjL 


pi 


g 


- - 


1 ' 


* ' 





M | ill 


ih m 


«.i!irin 



Q 
H 

o 
o 

LU 

to 





J ^ 



13 



z 
< 



L-LLLLLLLLLLLl, 

1 iimgijisi ci-jii" •■■■' 



r«r"nriTL-ri-ri-ri-rr 



+ 



4- 



sr 
o 
o 



+- 



z 
o 



Q 

tr 



i 
I- 



< 

> 



n- = 



> 



< 
> 



LU 



O 



tu 



14 



o 



15 



STATE COLLEGES 

EDUCATION BUILDING 

Morgan State College 
Baltimore 

PROJECT DESCRIPTION 

This facility will provide approximately 97,000 gross square feet 
for faculty offices, classrooms and laboratories to serve the Depart- 
ments of Education, Psychology and Sociology, presently located in 
Carnegie Hall, constructed some 50 years ago and which now affords 
most inadequate accommodations. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at right. Outline specifications are: 

Exterior walls Brick and pre-cast concrete. 

Structure Reinforced concrete. 

Roof Flat, built-up composition. 

Interior Slag block, painted; tile 

wainscot in toilets, 

acoustical tile ceilings. 
Floors Vinyl asbestos, terrazzo and 

ceramic tile in toilets. 
Electric Conventional for type of 

building. 

Heating Central Plant steam conversion. 

Air conditioning Conventional for type of 

building provided throughout . 
Miscellaneous Standard seating in lecture halls 



ESTIMATED PROJECT COST 

Construction $2,938,000 

Site improvements 2^,000 

Total $2,963,000 



16 




E-Avr 





South 




North 




MORGAN STATE COLLEGE 

NEW EDUCATION BUILDING 
BALTIMORE MARYLAND 



17 



A 






i 



J f 



escTtOH A 



UA 



^iifu*i J&0& 



^■A-.-sew-vi I ^ir*f ;m I -^AC-t-wcr w lo^^.^eo^u 



-■■ .#??«& 'M 







^^V 







«W5 -tOTAi- ^1f\^4 tjqPI 



future AcApgMic 



BA5£M£NT i&ii^g? ^ PT_^^AR 



18 



MORGAN 5TATE- COLL&Gt 
N&W education Building 
^AuTl^lORE, MARYtANP 




StCTIOkl >\ -£. 







ft £lji,T 

rrr 



i li n £i 



THIRTY FLOOR M,130 eC' f=T <SKO*e AC5A 



__:?-■ 




f ; 7 



:t% SJT: 






-,-t^-^T^l-rHr^T t - 



'» J 



second floor iMD«i5'>- rei 



MORGAN STATE COLLEGE 

NEW EDUCATION BUILDING 
BALTIMORE MARYLAND 



19 



STATE COLLEGES 

CLASSROOM BUILDING No. 2 
Towson State College 
Tows on 

PROJECT DESCRIPTION 

The rapidly growing enrollment creates the requirement for additional 
classroom, faculty offices, laboratories and related facilities. The 
need for additional classroom space is particularly critical. This 
facility, approximating 175 5 000 gross square feet includes extensive 
psychology laboratories, classrooms and faculty offices. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at the right. Outline specifications are: 

Exterior walls Brick, slag block, textured; stucco 

on metal lath. 
Structure Structural steel and concrete slab. 

Roof Flat, built-up composition. 

Interior Slag block; dry wall with vinyl 

covering; ceramic tile wainscot 

in toilets; acoustical tile ceilings 

Floors Vinyl asbestos; ceramic tile in 

toilets; terrazzo in entrances. 

Electric Conventional lighting for type of 

building . 

Plumbing Standard for classroom type structure. 

Heating and air conditioning . . . Conventional for type of building 

provided throughout . 



ESTIMATED PROJECT COST 

Construction $U, 675, 000 

Utilities 20,000 

Total $14,695,000 



20 










I 



a 






21 



+- 

I 

I 



■-T 
I 
I— 




j-i»*g j ilting 



<0 
(0 



J 
111 

> 
til 



SQ 








in 



J 
> 

I J 



MS 


!UJ; 


lit 


<0 




1 J 



22 




1—1- 

I I 



i 




t R ** 

AS) 

IS 

■5 "Ja- 
ffa* 



A 



M 












Li! 
> 



I 
h 

D 

IL 




Ida, 

— i S 



23 




24 



C^rJ 



1 



:I 



T~ 



- .* '■:: 









h 

< 
> 

t UJ 

-J 

OJ 

(- 
in 
< 

UJ 

Hi- . 



- 




I 



4^ 



-rt-i rt-i- 



F=R 



;rfa -Tj-r I i i I 



1 1(. J - I4_l_ , L-— 1 



rt-T-rf-r- 



"-f 




I- ' 1-1 |.|. I , | ll i J 



\ 



k« 

<L 
>l 

111 

-it 

01 

H< 

O 1 ir) 

i 




n 



SB 



Si 




I. 




^ 












8J 






aO 



1 

J 

I 

UJ 
-J I 

I 
h 

2 

UJ 

> 

w 



25 



UNIVERSITY OF MARYLAND 

AUDITORIUM BUILDING 

Maryland State College 
Princess Anne 

PROJECT DESCRIPTION 

This facility approximating 36,500 gross square feet, will provide 
an auditorium with an adequate stage and a seating capacity of 
1,200 which represents the projected enrollment of the College by 
1975* In addition, theater and music classrooms, music rehearsal 
and practice rooms are provided. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at the right. Outline specifications are: 

Exterior walls Brick cavity. 

Structure. . . Steel frame. 

Roof Built-up, slate. 

Interior Slag block and plaster, painted; 

suspended acoustical ceilings. 
Special consideration and 
acoustical treatment for 
Auditorium and music practice 
rooms . 
Floors Vinyl asbestos tile and terrazzo. 

Electric Standard as required for classroom 

and auditorium facility; basic 
stage lighting. 
Plumbing Standard for type of building. 

Air conditioning Conventional for type of building 

provided throughtout. 



ESTIMATED PROJECT COST 

Construction, including site 

improvements and utilities $l,5lU,000 



26 




FLOOg PL A hi 



h 



gate OKI y PL AH 





sasr ELEVXT/ O/V 







IXiEar E LBvarirM 



tli*./-e 







aayr,y g.°^?ro/V 



- ■ ." - • 



27 



UNIVERSITY OF MARYLAND 

ADDITION TO DINING HALL 

Maryland State College 
Princess Anne 

PROJECT DESCRIPTION 

To provide for increased enrollment, an addition approximating 7,000 
gross square feet must be constructed as two wings to the present 
dining facility. Water's Hall presently accommodates 350 persons and 
with the 230 additional seats provided by this addition, the food 
service requirements of the College should be met for several years. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at the right. Outline specifications are: 

Exterior walls Face brick compatible with existing 

building and slag block backup. 

Structure Brick bearing wall; bar joist roof 

construction. 

Roof Flat, built-up composition. 

Interior Slag block with special coating; 

acoustical tile ceiling. 
Floors Vinyl asbestos . 

Electric Conventional for type of building. 

Heating Extension of the present system. 

Air conditioning None. 



ESTIMATED PROJECT COST 

Construction $200,000 



28 




RtMove EJtirT 

ADDITIONAL FOOD I \VINOC"VO < 

^R.E.PAK.a.T/ION <* ME.V DINING AREA Rtl'^fc 



FIRST FLOOR PLAN 




NORTHEAST LLLVATION 































/ 




■. 






\ 


' 


_j 






■ ■ 






k 


y 






- 




2 


■ s 








A 

















\ 



EX1»T UlRL^i DORM 



' — 




FlWl*WS.O U «»:H 



PLOT PLAN_ 



29 



OINIM4 hall 
MARtLkND ST1TL £OU-t&£. 



UNIVERSITY OF MARYLAND 

ADDITION TO IIBRARY 

Baltimore County Campus 
Catonsville 

PROJECT DESCRIPTION 

Stack area in the present library will be saturated by the summer of 
1970, and with present rate of growth in enrollment, reading and 
study space is becoming critical. This addition, approximating 75> 5 000 
gross square feet is required to provide adequate library facilities 
for this growing campus . 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at the right. Outline specifications are: 

Exterior walls Striated limestone. 

Structure Reinforced concrete. 

Roof Built-up composition. 

Interior Slag block and plaster, painted; 

acoustical tile ceiling. 
Floors Vinyl asbestos tile and carpet; 

ceramic tile in toilets. 
Electric Standard as required for library 

functions . 
Heating Extension of present heating 

system from Central Plant. 
Plumbing Conventional for a library facility. 

Air conditioning Extension of present system from 

Central Plant. 



ESTIMATED PROJECT COST 

Construction $2,385,000 



30 





MOtOlID FHA1I 2 









1 


fUtUtl "'AM 


















.-._£ 










i 1 






1 










1 1 I T 


i 


:~.b: c dee 
Hi [rmrrmrrrnm 


":e" 

Jim 


m 


HI 


"E 

in 




u^-P 


-1444-ULL 






uusun 


i ruAst i 








rr';> ■':! >...'.! 2 















.i — h i 




I I ! I i I 





m 




TlONi Jo 



5EZ 



UNIVERSITY OF MARYLAND 

SWIMMING POOL ADDITION 

Baltimore County Campus 
Catonsville 

PROJECT DESCRIPTION 

Physical education facilities for both men and women have been 
provided for and will be adequate for some time. There are, however, 
no swimming facilities on the campus. This project, as an addition 
to the Men's Physical Education Building will provide an 8 lane 
swimming pool with dressing rooms for both men and women and five 
courts which may be used interchangeably for squash or handball. 

PRELIMINARY PLANS AND OUTLINE SPECIFICATIONS 

Plans are shown at the right. Outline specifications are: 

Exterior walls Brick cavity. 

Structure Steel frame. 

Roof Steel joists with insulated steel 

deck and built-up roof. 

Interior Tile wainscoting; slag block and 

plaster, painted; exposed ceiling 
construction with acoustical tile. 

Floors Vinyl asbestos and ceramic tile. 

Electric Conventional for type of building. 

Heating Extension from Central Plant. 

Plumbing Standard for type of building, 

including filtration system. 

Miscellaneous Floor and wall treatment as required 

for squash and handball courts. 



ESTIMATED PROJECT COST 

Construction $380,000 



32 



tVgIT £LEVAT:OKi 



. VJ£, r A ELL'.^' 'jN 



J L 



PHYSICAL £t>UCATION FACILITItS 



M£*JS PHYSICAL EC UCtrroH BUllDl>UO 





1 

aatrt ? 

: : ^ 

SojCP 

■to o m 










i 

2 






t - 






/ A'i.7t 






E/GMT LAME 75' WMAUNO POOL 
















..<• >: . ' f ■ 



















1 



Q»S£JtV*TrOrJ 4 MM A 



St/B/fja &i*** *V*tt ~y 



ptsystcAL zducation Mauriss 



?LOO£ PL AM 



SCA££S /"•zo'-o' 



33